Uploaded image for project: 'hc2vpp'
  1. hc2vpp
  2. HC2VPP-228

L2FIB update does not revert on failure

XMLWordPrintable

    • Icon: Bug Bug
    • Resolution: Done
    • Icon: High High
    • 17.10
    • 17.10
    • None
    • None
    • VPP: 17.10-rc0~247-g5095895~b2783

      Honeycomb: 1.17.10-3274

      Given the following configuration (see Postman in attachments):

      1. create bridge domain
      2. assign an interface to bridge domain
      3. create l2-fib entry

      When I try to update the l2-fib entry by PUTting the entire bridge domain, with just the fib entry modified, and the new entry is invalid (such as referencing a non-existing interface)... then the request fails, but the old L2-fib entry is not restored in operational data.

       

       

            jsrnicek_cisco Jan Srnicek
            selias Samuel Eliáš
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

              Created:
              Updated:
              Resolved: